If you are building a new pool in Northeast Florida, the enclosure is easy to push to “later.” In most cases, planning it at the same time as the pool is the smarter move. Here is why.

Why Planning Both Together Pays Off

The frame has to anchor into the deck

A pool cage is bolted to the pool deck or a poured footer. If the deck is already finished, the contractor works around what is there. If the enclosure is planned first, anchor points and footer locations can be built in cleanly.

One permitting and scheduling cycle

Coordinating the pool and the cage lets the schedule, inspections and approvals line up instead of starting over after the pool is done. You also avoid months of a pool sitting open to leaves, bugs and debris.

Better design decisions

Deck size, pool shape, nearby trees, door locations and sight lines all affect the best enclosure design. Making those choices once, together, gives a better result than fitting a cage to a pool that was never designed with one in mind.

When It Makes Sense to Wait

Budget is the common reason. If you build the pool first and add the cage later, tell your pool builder up front so the deck is sized and prepared for a future enclosure. That small step prevents expensive changes down the road.

What to Do Next

  • Share your pool plans with an enclosure contractor before the deck is poured.
  • Ask your pool builder to leave room for the cage footprint and anchor locations.
  • Confirm HOA rules on enclosure height, color and style early.

Kish Enclosures is family-owned, licensed and insured (Lic. #SCC131149801), and we handle permits for you. Request a free estimate or call (904) 805-4343 while your pool is still on paper.

Related Reading